What a bid estimate should include

What a bid estimate should include

A bid is more than a total. These are the pieces that let a reviewer trust the number and let you defend it later.

A bid is more than a total. The document has to show how the number was built and what it leaves out.

Scope, assumptions and exclusions

Every estimate needs a short written scope: what is included, what is not, and what you assumed when the drawings were not clear. This is the section that protects you after award.

Keep it specific. Write that the estimate excludes temporary power, not that it excludes general conditions.

Pricing by line item

A single lump sum cannot be checked. Price the work by trade or by phase, with quantity, unit and unit cost visible on every line.

  • Material, labor, equipment and markup shown separately.
  • Allowances identified with the scope they cover.
  • Alternates priced separately from the base bid.

A review before the deadline

Finish the estimate with time to review it. Compare the quantities against the takeoff, confirm the addenda are included and check the math on the markup. A bid submitted early enough to be reviewed is a bid you can stand behind.